Repeaters 6-13-2020

Pictures of the 147.210+ & 444.600 Phifer Mountain Repeater Building on June 13, 2020 after KC2CBD & KN4CHC did some maintenance.

From outside the door.

Behind the Repeaters on the wall is the wiring for the Mesh Nodes on the tower and a Mikrotik hAP as a switch and WiFi access to the mesh system.