On April 11, 1997 the present repeater building was placed in the present location.
Here are pictures of when it was new.
(Click on any picture for a larger version)
Above the Repeater building being put in place.
Above Charlie Cobble is standing in front of the hole he just cut for the air conditioner.
Above the inside before insulation and OSB installed.
Above Fred Breeding, WB4SUO working on putting moulding around the air conditioner